Search
135 articles for “Construction Project”
-
ASSESSMENT OF EFFECTIVENESS OF LEAN TECHNIQUES IN CONSTRUCTION INDUSTRY- A PROJECT WITH DELAY
Abstract: Construction management and usage of management techniques and tools to cater the needs of the shareholders to complete the project in a given time, cost and quality are the important factors in project management. But although some techniques and tools to manage the projects are used, there are delays in construction project even now. Lean construction helps in meeting the requirements of the stakeholders within the given time, cost and …
Published in International Journal of Architecture and Infrastructure Planning · Vol. 9, Issue 1, 2023 · pp. 17–34 Read article
-
Application of Building Information Modelling (BIM) in IGBC Certified Green Building Project: Transforming Construction Sustainability
Abstract: Abstract Construction industry sustainability goals can be achieved through implementation of Building Information Modelling (BIM), which simultaneously contribute to Lifecycle Cost Assessments of building projects. BIM’s integrated approach to design, construction, and facility management contributes to more sustainable building practices by enabling better decision-making throughout a project’s lifecycle. Design IGBC certified green building project with the help of BIM to analyse key aspects of sustainable development, including energy efficiency, water …
Published in International Journal of Structural Mechanics and Finite Elements · Vol. 11, Issue 1, 2025 Read article
-
Key factors and Challenges in Supply Chain Management practices specific to prefabricated projects
Abstract: Abstract: This study embarks on a critical examination of Supply Chain Management (SCM) within the realm of prefabricated housing and building (PHB), acknowledging its pivotal role in the overall construction industry. Employing qualitative review methods, it strives to unravel the intricate relationship between SCM practices and the success of prefabricated construction projects. The focus is on advocating for a systematic approach to comprehend SCM adoption comprehensively. At its core, this …
Published in International Journal of Town Planning and Management · Vol. 10, Issue 1, 2024 · pp. 26–40 Read article
-
Identification of KPIs in Construction Industry: A Review
Abstract: The success of any construction project depends on project performance. Construction industry contains large number of parties, i.e. clients, stakeholders, shareholders, consultants, contractors, regulators and others. The factors that affect the performance of construction projects result in disputes, claims, failures and delays in construction. Through performance measurement, organizations can improve their productivity and also compare it with their competitors, as well as identifying their weakness. The main aim of this …
Published in International Journal of Construction Engineering and Planning · Vol. 5, Issue 1, 2019 · pp. 28–38 Read article
-
Assessment of Project Cost Control Strategies in the Nigerian Construction Industry – A Case Study of South West Nigeria
Abstract: The construction industry is a major consumer of capital resources by virtue of the magnitude, complexity and nature of works it executes. Yet improving cost performance still remains a chronic challenge facing the construction industry worldwide. Apart from advance made by contractors to devise mechanism to manage project cost, studies across the world reveal that construction projects are hardly completed within budget. However this background is considered unhealthy for an …
Published in International Journal of Structural Engineering and Analysis · Vol. 2, Issue 1, 2016 · pp. 32–42 Read article
-
Critical study on methods and approaches to mitigate delay in construction.
Abstract: Delays are one of the most common phenomena in the construction industry. Time overrun has happened in most type of construction projects, whether it is a residential project or infrastructure project. The purpose of this research is to identify non-excusable delay factors, their impact on different stages of the project and the means of minimize these delays. The research method used here is qualitative study. The primary data collection to …
Published in International Journal of Architecture and Infrastructure Planning · Vol. 9, Issue 1, 2023 · pp. 35–50 Read article
-
Sustainable Management of Construction Claims; Types, Causes and Settlements
Abstract: Abstract Claims are considered as the most disruptive and unpleasant events for most of construction projects as of their impacts on project performance and objectives. The study in this paper was directed to identify the current claims types in construction projects in Jordan, and then identify the causes of each type related to project stakeholders (owner, consulting engineer, contractor and others). The research is then conducted to determine the current …
Published in International Journal of Construction Engineering and Planning · Vol. 1, Issue 2, 2015 · pp. 1–13 Read article
-
Procurement and Deployment of Equipment for Contracts in Civil Engineering Construction
Abstract: Many contracts have suffered a lot of delays and have faced challenges due to procurement-related matters and inadequate manpower to handle equipment for optimal performance. This study was aimed at the procurement of equipment and utilization of machines in civil engineering contracts. Methodology is basically site visitation, literature review and discussion with engineers, experts and workers on site. Parameters are liable for the procurement of materials and utilizing their lead …
Published in International Journal of Construction Engineering and Planning · Vol. 8, Issue 2, 2022 · pp. 29–37 Read article
-
The Role of Technology Integration in Advancing Construction Education
Abstract: The construction industry is undergoing a significant transformation with the advent of technologicalinnovations, necessitating a parallel evolution in construction education. This study investigates the roleof technology integration on student learning outcomes and industry preparedness in constructioneducation, addressing a critical need to bridge the gap between academic and industry requirements.Surveys and interviews were combined in a mixed-method approach. By adopting the purposivesampling technique, a sample size of 80 respondents was obtained, …
Published in International Journal of Architecture and Infrastructure Planning · Vol. 11, Issue 1, 2025 Read article
-
Projects in Accelerated Conditions
Abstract: The work aims in identifying the causes of delay in construction projects and the acceleration techniques adopted to overcome them. Questionnaire survey with experts from industry was used for generation of data and analyzed using Relative Importance Index and Spearmen’s Rank Correlation Coefficient test. On analyses it was noticed that project complexity, labour challenges and resequencing of activities are the main barriers impacting the timeline for construction projects. Various acceleration …
Published in International Journal of Construction Engineering and Planning · Vol. 9, Issue 2, 2023 · pp. 46–56 Read article
-
The Financial Implication of Weather Condition as a Determinant of On-Site Productivity and Contract Duration
Abstract: The effects of weather conditions on construction projects is an identifiable one as inclement weather can cause a lot of upset in works being executed, particularly in substructure and the wet trades such as concrete works. A cold dry weather harsh weather as in the case of the harmattan period causes drying out before concrete sets. Wet weather such as those experienced during the rainy seasons, which in the Niger …
Published in International Journal of Construction Engineering and Planning · Vol. 7, Issue 2, 2021 · pp. 6–14 Read article
-
Feasibility of Hybrid Construction using Emerging Technologies for Housing Board Projects
Abstract: The traditional methods employ a larger workforce and more trained workers to accomplish efficiency, and a lack of these factors might impact the overall length, cost, and quality goals. Advanced robotic technology has been created to participate in on- site building as a solution to this problem. Technology like 3D printing is one of those tools that makes a job more efficient. The effectiveness of building can be improved by …
Published in International Journal of Architecture and Infrastructure Planning · Vol. 9, Issue 1, 2023 · pp. 104–112 Read article
-
DESIGN AND ESTIMATION OF RESIDENTIAL BUILDING USING ETABS AND QUANTITY TAKE OFF SOFTWARE: A REVIEW
Abstract: The drafting, study, and design of a building are the most critical phases in its construction and planning. The project that will be completed is the construction of a multi-story building that will be used as a home. According to the requirements and available space, the building plan was created using AutoCAD software. The ETABS programme was used to evaluate and construct the superstructure, or the building frame. A quantity …
Published in International Journal of Architectural Heritage · Vol. 4, Issue 1, 2021 · pp. 1–3 Read article
-
Application of Total Quality Management & Retrofitting Techniques for Rehabilitation (By using Carbon Fiber Method)
Abstract: Abstract— The report focuses on the Application of Total Quality Management (TQM) and Retrofitting Techniques for Rehabilitation in construction projects. The aim is to extend the lifespan of aging structures, ensure safety, and improve performance through systematic approaches. TQM provides a framework for continuous improvement and customer satisfaction, ensuring that rehabilitation projects meet modern standards. Various retrofitting techniques, such as seismic retrofitting, structural strengthening, and energy efficiency upgrades, are employed …
Published in International Journal of Construction Engineering and Planning · Vol. 11, Issue 2, 2025 · pp. 1–8 Read article
-
Bidding Strategy for Building Projects Based on Game Theory
Abstract: The owners of construction projects typically apply a competitive bid process to award a contract to the qualified bidder who submits the lowest price. For the contractors, it is very difficult to decide an optimal mark-up and bid value to win the contract and at the same time to secure sustaining profitability as high as possible. For that, from the various literatures related to the bidding problems, the factors are …
Published in International Journal of Construction Engineering and Planning · Vol. 5, Issue 1, 2019 · pp. 1–11 Read article
-
ANALYSIS OF IMPACT OF CONSTRUCTION ACCIDENTS AND THEIR COST OF PREVENTION AND CONSEQUENCES IN HSE
Abstract: Construction sector is amongst the most hazardous sector in terms of health and safety of the workers and employees. Construction sites are prone to accidents from very low to catastrophic severity impacts. Construction sector is amongst the most hazardous sector in terms of health and safety of the workers and employees. Construction sites are prone to accidents from very low to catastrophic severity impacts. Any accident on site has significant …
Published in International Journal of Housing and Human Settlement Planning · Vol. 8, Issue 1, 2022 · pp. 32–46 Read article
-
Planning, Estimation, Costing, and Scheduling of Commercial Building using MS Project
Abstract: Planning, estimation, and scheduling are very important in a construction project and it helps toavoid delays in the project. The current project deals with planning, costing, estimation, andscheduling of office buildings. It is a G+5 reinforced concrete framed structure with modern features.The emergency exit and slope have been provided at the opening of the building for hassle-freemovement of disabled people. The building is planned in accordance with the National Building …
Published in International Journal of Construction Engineering and Planning · Vol. 7, Issue 1, 2021 · pp. 14–35 Read article
-
Life Cycle Assessment of Traditional Clay Bricks and Autoclaved Aerated Concrete (AAC) Blocks: A Comparative Study in Environmental Sustainability
Abstract: Abstract: In today's construction industry, the imperative to merge quality with environmental responsibility has prompted a profound paradigm shift towards eco-friendly construction materials. This study conducts a comprehensive examination of the environmental impacts associated with traditional bricks and Autoclaved Aerated Concrete (AAC) blocks, with a specific focus on Life Cycle Assessment (LCA). While traditional bricks, steeped in historical significance, offer durability and high thermal mass, their kilning process raises significant …
Published in International Journal of Architecture and Infrastructure Planning · Vol. 10, Issue 1, 2024 · pp. 55–64 Read article
-
Evaluation of Manpower Training and Development in Nigeria Construction Industry
Abstract: Abstract Lack of technical and managerial skill is often identified as one of the major problem facing construction industry in developing countries resulting in poor competitiveness with their developed and industrialized counterparts. Research had shown that building failure is not only caused as result of inefficient design, lack of standard materials, but also due to lack of skilled labour in the construction project. This research evaluate manpower training and development …
Published in International Journal of Construction Engineering and Planning · Vol. 2, Issue 1, 2016 · pp. 13–26 Read article
-
Formulation of Community-Based Strategies to Mitigate the Impact of a New Road Construction on Housing and Environment
Abstract: Rajshahi is a divisional city and the population of this city is increasing gradually. That’s why the existing transportation infrastructure cannot accomplish the present demand. The introduction of a new road or the expansion of the existing ones to relieve the excessive traffic pressure is a futile exercise. But this can create a different impact on the local community. The objective of this study is to identify the impacts which …
Published in International Journal of Town Planning and Management · Vol. 4, Issue 2, 2018 · pp. 48–58 Read article