International Journal of Software Computing and Testing

A Study on Supervised Machine Learning-based Airports/Flight Delay Analysis and Classification

  1. Bhawana Pillai
  2. Simran Jot Singh Sodhi ✉

Abstract

Airline delays are a major cause of the financial losses that plague the global aviation business. Airports, airlines, and passengers all suffer when flights are delayed. Their forecast is vital to the commercial aviation industry's decision-making process. Flight presents a significant obstacle for the aviation sector. Increased air traffic and subsequent flight delays are a direct result of the aviation industry's rapid growth over the past two decades. The economic and ecological costs of flight delays are significant. Flight delays can lead to significant financial setbacks for commercial airlines. That is why they take all the precautions they can think of to ensure that flights are not cancelled or delayed. From a data science point of view, this study gives a comprehensive literature analysis of methods for constructing flight delay prediction models. In this article, we take a look at a taxonomy of efforts made to solve the issue of flight delay prediction and characterize them in terms of their scope, data, and computational approaches, paying special emphasis to the growing prevalence of machine learning methods. In addition, the complexity of the air transportation system, the plethora of forecast methodologies, and the flood of flight data made it difficult to construct effective prediction models for flight delays. Predicting flight delays using machine learning techniques is the topic of this article. The focus of this study is on determining whether or not various machine learning techniques can accurately predict flight delays and isolate the most important contributors to such disruptions. Airline schedules, airport wait times, weather forecasts, and other characteristics are all included in the dataset used for the research. The study opens with a summary of prior research on the topic of utilizing machine learning to anticipate aircraft delays. Overall, the results of this study suggest that machine learning approaches may enhance the precision and utility of flight delay forecasts, leading to a safer and more efficient aviation infrastructure.

References (41)

  1. Pophale SS, Patil PR, Potgantwar AD, Bhaladhare PR. Flight delay analysis and prediction using machine learning algorithms. Math Statist Eng Appl. 2022; 71 (4): 6071–6085.
  2. Mohiddin SA, Komali Priya G, Sai DK, Sree PL, Sriram P. Flight delay analysis using machine learning. Dogo Rangsang Res J. 2022; 1: 841–844.
  3. Borse Y, Jain D, Sharma S, Vora V, Zaveri A. Flight delay prediction system. Int J Eng Res Techol. 2020; 9 (3): 88–92. doi:10.17577/ijertv9is030148.
  4. Shah D, Lodaria A, Jain D, D’Mello L. Airline delay prediction using machine learning and deep learning techniques. Int J Recent Technol Eng. 2002; 9 (2), 1049–1054. doi:10.35940/ijrte.b4047.079220.
  5. Reddy RT, Basa Pati P, Deepa K, Sangeetha ST. Flight delay prediction using machine learning. In: 2023 IEEE 8th International Conference Converg. Technology, I2CT 2023, Lonavla, India, April 7–9, 2023. pp. 5–9. doi:10.1109/I2CT57861.2023.10126220.
  6. Rajesh K, Srikanth V. Predicting flight delays using machine learning : an analysis of comprehensive data and advanced techniques. Int J Adv Res Computer Commun Eng. 2023; 12 (4): 82–85. doi:10.17148/IJARCCE.2023.12416.
  7. Hossain A. Application of Interpretable Machine Learning in Flight Delay Detection. Masters Thesis. Arlington, TX, USA: Univertsity of Texas at arlington; 2021. Available at https://rc.library.uta.edu/uta-ir/bitstream/handle/10106/29791/
  8. HOSSAIN-THESIS-2021.pdf?sequence=1&isAllowed=y
  9. Carvalho L, Sternberg A, Gonçalves LM, Cruz AB, Soares JA, Brandão D, Carvalho D, Ogasawara E. On the relevance of data science for flight delay research: a systematic review. Transport Rev. 2021; 41 (4): 499–528. doi:10.1080/01441647.2020.1861123.
  10. Wang T, Zheng Y, Xu H. A review of flight delay prediction methods. In: 2022 2nd International Conference on Big Data Engineering and Education (BDEE), Chengdu, China, August 5–7, 2022. pp.135–141. doi:10.1109/BDEE55929.2022.00029.
  11. McDonough, KP. United States Department of Transportation. Choice Curr Rev Acad Lib. 2013; 50 (6): 1073. doi:10.5860/choice.50-3233.
  12. CQ Press. Federal Aviation Administration. Fed Regulat Guide. 2020; 0: 906–912. doi:10.4135/9781544377230.
  13. Reason J, Hollnagel E, Paries J. Revisiting the Swiss Cheese Model of Accidents. Brétigny-sur-Orge, France: Eurocontrol Exterimental Centre, European Organization for. Safety of Air Navigation; 2006.
  14. Reynolds-Feighan AJ, Button KJ. An assessment of the capacity and congestion levels at European airports. J Air Transp Manage. 1999; 5 (3): 113–134. doi:10.1016/S0969-6997(99)00006-X.
  15. Rong Y, Wang J, Ding J. RIA-based visualization platform of flight delay intelligent prediction. In: 2009 ISECS International Colloquium on Computing, Communication, Control, and Management, Sanya, China, August 8–9, 2009. pp. 94–97. doi:10.1109/CCCM.2009.5267976.
  16. Tu Y, Ball MO, Jank WS. Estimating flight departure delay distributions – a statistical approach with long-term trend and short-term pattern. J Am Stat Assoc. 2008; 103 (481): 112–125. doi:10.1198/016214507000000257.
  17. Wong JT, Tsai SC. A survival model for flight delay propagation. J Air Transp Manage. 2012; 23: 5–11. doi:10.1016/j.jairtraman.2012.01.016.
  18. Zhang J, Xu XH, Wang F, Wei DX. Airport delay performance evaluation based on fuzzy linear regression model. Jiaotong Yunshu Gongcheng Xuebao / J Traffic Transp Eng. 2010; 10 (4): 109–114. doi:10.19818/j.cnki.1671-1637.2010.04.018.
  19. Xu N, Sherry L, Laskey KB. Multifactor model for predicting delays at U.S. airports. Transp Res Rec. 2008; 2052 (1): 62–71. doi:10.3141/2052-08.
  20. Beatty R, Hsu R, Berry L, Rome J. Preliminary evaluation of flight delay propagation through an airline schedule. Air Traffic Control Q. 1999; 7 (4): 259–270. doi:10.2514/atcq.7.4.259.
  21. Abdelghany KF, Shah SS, Raina S, Abdelghany AF. A model for projecting flight delays during irregular operation conditions. J Air Transp Manage. 2004; 10 (6): 385–394. doi:10.1016/j.jairtraman.2004.06.008.
  22. Narsimhulu K, Manish Reddy K, Nikhil K, Sai Teja E. Predicting flight delays with error calculation using machine learning. YMER. 2022; 21 (5): 364–369. doi:10.37896/ymer21.05/40.
  23. Haq AU, Li JP, Memon MH, Nazir S, Sun R, Garciá-Magarinõ I. A hybrid intelligent system framework for the prediction of heart disease using machine learning algorithms. Mobile Inform Syst. 2018; 2018: Article 3860146. doi:10.1155/2018/3860146.
  24. Anusha DA, Ratna Kumar B, Naga Ganesh Reddy D. Prediction of flight delay using machine learning. Int Res J Mod Eng Technol Sci. 2022; 4 (6): 2486–2491. doi:10.1109/I2CT57861.2023.10126220.
  25. Rahman K, Aziz MA, Usman N, Kiren T, Cheema TA, Shoukat H, Bhatia TK, Abdollahi A, Sajid A. Cognitive lightweight logistic regression-based IDS for IoT-enabled FANET to detect cyberattacks. Mobile Inform Syst. 2023; 2023: Article 76903222. doi:10.1155/2023/7690322.
  26. Vinay Kumar V, Grace Kanmani Prince P. Deep belief network assisted quadratic logit boost classifier for brain tumor detection using MR images. Biomed Signal Process Control. 2023; 81: 104415. doi:10.1016/j.bspc.2022.104415.
  27. El Elhola W, Bozed K. Performance analysis of brain tumor detection based on gradient boosting machine – CNN model. In: 2022 IEEE 2nd International Maghreb Meeting of the Conference on Sciences and Techniques of Automatic Control and Computer Engineering (MI-STA), Sabratha, Libya, May 23–25, 2022. pp. 544–547. doi:10.1109/MI-STA54861.2022.9837738.
  28. Kalyani NL, Jeshmitha G, Sai BSU, Samanvitha M, Mahesh J, Kiranmayee BV. Machine learning model–based prediction of flight delay. In: 2020 Fourth International Conference on I-SMAC (IoT in Social, Mobile, Analytics and Cloud) (I-SMAC), Palladam, India, October 7–9, 2020. pp. 577–581. doi:10.1109/I-SMAC49090.2020.9243339.
  29. Meel P, Singhal M, Tanwar M, Saini N. Predicting flight delays with error calculation using machine learned classifiers. In: 2020 7th International Conference on Signal Processing and Integrated Networks (SPIN), Noida, India, February 27–28, 2020. pp. 71–76. doi:10.1109/SPIN48934.2020.9071159.
  30. Kuhn N, Jamadagni N. Application of machine learning algorithms to predict flight arrival delays. CSS229: Autumn. 2017. pp. 1–6. Avalable at https://cs229.stanford.edu/proj2017/final-reports/5243248.pdf
  31. Zhou H, Li W, Jiang Z, Cai F, Xue Y. Flight departure time prediction based on deep learning. Aerospace. 2022; 9 (7): 394. doi:10.3390/aerospace9070394.
  32. Basturk O, Cetek C. Prediction of aircraft estimated time of arrival using machine learning methods. Aeronaut J. 2021; 125 (1289): 1245–1259. doi:10.1017/aer.2021.13.
  33. Gui G, Liu F, Sun J, Yang J, Zhou Z, Zhao D. Flight delay prediction based on aviation big data and machine learning. IEEE Trans Vehic Technol. 2020; 69 (1): 140–150. doi:10.1109/TVT.2019.2954094.
  34. Guo Z, Yu B, Hao M, Wang W, Jiang Y, Zong F. A novel hybrid method for flight departure delay prediction using random forest regression and maximal information coefficient. Aerosp Sci Technol. 2021; 116: 106822. doi:10.1016/j.ast.2021.106822.
  35. Wu W, Cai K, Yan Y, Li Y. An improved SVM model for flight delay prediction. In: 2019 IEEE/AIAA 38th Digital Avionics Systems Conference (DASC), San Diego, CA, USA, September 8–12, 2019. pp. 1–6. doi:10.1109/DASC43569.2019.9081611.
  36. Zhang B, Ma D. Flight delay prediciton at an airport using maching learning. In: 2020 5th International Conference on Electromechanical Control Technology and Transportation (ICECTT), Nanchang, China, May 17–17, 2020. pp. 557–560. doi:10.1109/ICECTT50890.2020.00128.
  37. Zoutendijk M, Mitici M. Probabilistic flight delay predictions using machine learning and applications to the flight-to-gate assignment problem. Aerospace. 2021; 8 (6): 152. doi:10.3390/aerospace8060152.
  38. Dou X. Flight arrival delay prediction and analysis using ensemble learning. In: 2020 IEEE 4th Information Technology, Networking, Electronic and Automation Control Conference (ITNEC), Chongqing, China, June 12–14, 2020. pp. 836–840. doi:10.1109/ITNEC48623.2020.9084929.
  39. Chakrabarty N. A data mining approach to flight arrival delay prediction for American Airlines. In: 2019 9th Annual Information Technology, Electromechanical Engineering and Microelectronics Conference (IEMECON), Jaipur, India, March 13–15, 2019. pp. 102–107. doi:10.1109/IEMECONX.2019.8876970.
  40. Mueller ER, Chatterji GB. Analysis of aircraft arrival and departure delay characteristics. In: AIAA's Aircraft Technology, Integration, and Operations (ATIO) 2002 Technical Forum, Los Angeles, CA, USA, October 1–3, 2002. doi:10.2514/6.2002-5866.
  41. Thiagarajan B, Srinivasan L, Sharma AV, Sreekanthan D, Vijayaraghavan V. A machine learning approach for prediction of on-time performance of flights. In: 2017 IEEE/AIAA 36th Digital Avionics Systems Conference (DASC), St Petersburg, FL, USA, September 17–21, 2017. pp. 1–6. doi:10.1109/DASC.2017.8102138.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support